Renowned for classic elegance, The Connaught’s unmistakable façades were given a facelift with Thomann-Hanry®’s scaffold-free façade gommage® technique.


Carlos Pl, Mayfair, London W1K 2AL


Grade II Listed building


Brick, Portland Stone

Surface area

500 sq. m.

Project duration

2 days

Back to projects arrow-tip

The exterior of The Connaught building also benefited from the added protection of Aqua Fend® – a sound investment which plays an essential role in the preservation of a façade, reducing ongoing maintenance costs and protecting the structure.

Additionally, sections of the balcony copings were replaced with new Portland stone, carved in our workshop, and a significant amount of repair and lead replacement was carried out. The failed asphalt to the front balconies was lifted and replaced and new drainage installed. Disruption was kept to a minimum throughout, and The Connaught now oozes its original charm and sophistication.